PROJECTS

HORSE DRIVE INTERCHANGE

 

OWNER:  City of Las Vegas

CONTRACT VALUE:  $41,334,115

DURATION:  18 months

SCOPE:

  • Constructing the largest single point urban interchange bridge in the valley over US 95 as well as a secondary bridge over Frontage Road
  • Moving 430,000 cubic yards of roadway embankment
  • Placed 8,397 linear feet of box culverts and RCP pipe
 
  • Provided and placed 40,918 cubic yards of type 1 aggregate base and 266,459 square yards of plantmix surfacing
  • Electrical work, signage and landscape beautification
  • Dealt with multiple funding and inspection agencies





© 2011 Capriati Construction Corp.
All rights reserved